Happy White Face - Transmission Project

Location: Hereford, TX

 

Line Voltage: 345 kV

 

Line Length: 9.9 mile

 

Conductor Size: 795 Drake ACSR Bundle

 

Project Description: Concrete single pole 345kV double bundled transmission line. Anchor and guying installation, along with EHS and OPGW fiber.